ispace completes preliminary design review for Mission 3 ULTRA lander

ispace announced November 13 that it completed the ULTRA lander’s preliminary design review, incorporating engine modifications for Mission 3’s planned 2028 launch.

The review established a system-wide design baseline covering mass, power and Delta-V, and verified propulsion design incorporating a Nammo engine. ispace will next undertake detailed design work toward a critical design review, followed by flight-model manufacturing and qualification testing. ULTRA’s inaugural flight is Mission 3, scheduled for 2028.

Official · 1 source

Evidence

  1. Officialispace completed the ULTRA PDR for Mission 3, scheduled for 2028.
    “announced today that it has completed the Preliminary Design Review (PDR) for the ULTRA lander to be used in Mission 3, scheduled for launch in 2028.”

    Source:ispace News

SinceFeed

Track Commercial Spaceflights on SinceFeed

Primary sources, verbatim quotes, and only what changed since you last checked.

Build your feed →